Delfield SSR2-SH Installation Manual Page 2

  • Download
  • Add to my manuals
  • Print
  • Page
    / 28
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 1
Supremacy Series
®
Reach-Ins Service and Installation Manual
For customer service, call (800) 733-8829 or (800) 723-8948, Fax (989) 773-3210, www.deleld.com
2
Supremacy Series
®
Reach-Ins Service and Installation Manual
3
For customer service, call (800) 733-8829 or (800) 723-8948, Fax (989) 773-3210, www.deleld.com
RECEIVING AND INSPECTING UNIT ................................................. 2
MECHANICAL DATA ....................................................................... 3-7
INSTALLATION............................................................................... 8-9
OPERATION ...................................................................................... 9
ROUTINE MAINTENANCE ............................................................ 9-10
ERC CONTROL................................................................................ 11
DEFROST TIMER............................................................................. 12
WIRING DIAGRAM..................................................................... 13-17
REPLACEMENT PARTS LIST...................................................... 18-21
STANDARD LABOR GUIDELINES.................................................... 22
STANDARD WARRANTIES......................................................... 23-24
AUTHORIZED PARTS DEPOTS...........................................BACKPAGE
On refrigeration and freezer storage units, the serial tag is located
inside the right most door (the only door on a one-door unit), near the
top front corner of the right interior wall.
Always have the serial number of your unit available when calling for
parts or service. A complete list of authorized Deleld parts depots is
shown on the back cover of this manual.
This manual ©2004 The Deleld Company. All rights reserved. Reproduction without
written permission is prohibited. Supremacy Series and Deleld are registered trademarks
of The Deleld Company
Even though most equipment is shipped crated, care should
be taken during unloading so the equipment is not damaged
while being moved into the building.
1. Visually inspect the exterior of the package and skid or
container. Any damage should be noted and reported
to the delivering carrier immediately.
2. If damaged, open and inspect the contents with the
carrier.
3. In the event that the exterior is not damaged, yet upon
opening, there is concealed damage to the equipment
notify the carrier. Notification should be made verbally
as well as in written form.
4. Request an inspection by the shipping company of the
damaged equipment. This should be done within 10
days from receipt of the equipment.
5. Check the lower portion of the unit to be sure legs or
casters are not bent.
6. Also open the compressor compartment housing and
visually inspect the refrigeration package. Be sure lines
are secure and base is still intact.
7. Freight carriers can supply the necessary damage forms
upon request.
8. Retain all crating material until an inspection has been
made or waived.
RECEIVING AND INSPECTING THE EQUIPMENT
CONTENTS
SERIAL NUMBER LOCATION
Page view 1
1 2 3 4 5 6 7 ... 27 28

Comments to this Manuals

No comments